project summary

Permanent Offices

category
location

Southeastern U.S.A.

Sunbelt facility

Specialized Structures
A Sunbelt Company

size

3,808 sq. ft.

key achievements

  • Expanded office space four times larger than the old facility.

  • In-house modular construction reduced costs and timelines.

  • Provides capacity for future growth and team expansion.

  • Seamless operations during construction with on-site temporary offices.

Building Floor Plan Highlights

  • Open floor plan for flexible workspaces.

  • Conference room for meetings and collaboration.

  • High ceilings and abundant natural light.

  • Four modules totaling 3,808 sq. ft..

  • Designed and manufactured in-house by Specialized Structures.

case study summary

Specialized Structures set out to solve a communication challenge created by having its manufacturing team in Willacoochee, GA, and sales and management in Douglas, GA. As the company grew, this separation hindered collaboration and efficiency.

To unify operations, they designed and built a new 3,808-square-foot modular office at their own factory. The four-module facility—four times larger than their previous office—features an open floor plan, conference room, high ceilings, and large windows. By bringing all office employees together under one roof, the new office provides space for growth while fostering stronger teamwork and a more connected company culture.

key achievements

  • Expanded office space four times larger than the old facility.

  • In-house modular construction reduced costs and timelines.

  • Provides capacity for future growth and team expansion.

  • Seamless operations during construction with on-site temporary offices.

Building Floor Plan Highlights

  • Open floor plan for flexible workspaces.

  • Conference room for meetings and collaboration.

  • High ceilings and abundant natural light.

  • Four modules totaling 3,808 sq. ft..

  • Designed and manufactured in-house by Specialized Structures.

case study summary

Specialized Structures set out to solve a communication challenge created by having its manufacturing team in Willacoochee, GA, and sales and management in Douglas, GA. As the company grew, this separation hindered collaboration and efficiency.

To unify operations, they designed and built a new 3,808-square-foot modular office at their own factory. The four-module facility—four times larger than their previous office—features an open floor plan, conference room, high ceilings, and large windows. By bringing all office employees together under one roof, the new office provides space for growth while fostering stronger teamwork and a more connected company culture.

resources

Case Study PDF