project summary

Healthcare Facility

category
location

Midwestern U.S.A.

Sunbelt facility

Whitley Manufacturing
A Sunbelt Company

size

5,400 sq. ft.

key achievements

  • Achieved a 35% reduction in construction timeline compared to conventional building.
  • Enabled rapid occupancy to support growing patient demand.
  • Met all health, state, and local regulatory requirements.
  • Installed complex plumbing and medical systems off-site to improve quality control.
  • Minimized site disruption during installation.

Building Floor Plan Highlights

  • Dedicated dialysis treatment floor with multiple patient stations.
  • Centralized nurse station for optimal patient visibility.
  • Isolation treatment room for infection control.
  • Exam and consultation rooms.

case study summary

The Dialysis Clinic’s growth plan called for the addition of a new facility. Recognizing a strong market opportunity, the client was determined to move quickly-accelerating delivery to maximize return on investment and ensure they were first to market in the region.

Whitley responded with a streamlined design-build approach that prioritized both speed and quality. By leveraging efficient project management, early trade coordination, and innovative construction methods, the team reduced the overall timeline by 35% compared to conventional delivery methods-without compromising performance or compliance.

The completed dialysis facility meets stringent healthcare regulations and industry standards, providing a safe, comfortable, and highly functional environment for patients and staff. The building incorporates a sophisticated plumbing infrastructure, including reverse osmosis (R.O.) and bicarbonate distribution lines essential for renal treatment operations. Careful planning and installation ensured reliability, redundancy, and long-term operational efficiency.

Beyond functionality, the facility presents a modern, professional exterior that reflects the clinic’s brand and commitment to care.

key achievements

  • Achieved a 35% reduction in construction timeline compared to conventional building.
  • Enabled rapid occupancy to support growing patient demand.
  • Met all health, state, and local regulatory requirements.
  • Installed complex plumbing and medical systems off-site to improve quality control.
  • Minimized site disruption during installation.

Building Floor Plan Highlights

  • Dedicated dialysis treatment floor with multiple patient stations.
  • Centralized nurse station for optimal patient visibility.
  • Isolation treatment room for infection control.
  • Exam and consultation rooms.

case study summary

The Dialysis Clinic’s growth plan called for the addition of a new facility. Recognizing a strong market opportunity, the client was determined to move quickly-accelerating delivery to maximize return on investment and ensure they were first to market in the region.

Whitley responded with a streamlined design-build approach that prioritized both speed and quality. By leveraging efficient project management, early trade coordination, and innovative construction methods, the team reduced the overall timeline by 35% compared to conventional delivery methods-without compromising performance or compliance.

The completed dialysis facility meets stringent healthcare regulations and industry standards, providing a safe, comfortable, and highly functional environment for patients and staff. The building incorporates a sophisticated plumbing infrastructure, including reverse osmosis (R.O.) and bicarbonate distribution lines essential for renal treatment operations. Careful planning and installation ensured reliability, redundancy, and long-term operational efficiency.

Beyond functionality, the facility presents a modern, professional exterior that reflects the clinic’s brand and commitment to care.

resources

Case Study PDF