project summary

Modular Retail Space

category
location

Northeastern U.S.A.

Sunbelt facility

Whitley Manufacturing
A Sunbelt Company

size

1,820 sq. ft.

key achievements

  • 85% of construction completed offsite.
  • Store completed in approximately 10 weeks.
  • Reduced on-site labor hours and material waste.
  • No disruption to surrounding retail operations.
  • Accelerated time to revenue and grand opening.

Building Floor Plan Highlights

  • Customer entry with branded storefront and large glass façade.
  • Dedicated order counter and POS stations.
  • Open kitchen layout with clear workflow zones.

case study summary

Requiring a rapid way to grow their franchise development program, Modular construction became the answer. The goal: implement their new Pizza Theater design for its emerging restaurants and have them operational faster than a conventional build. Whitley’s accelerated manufacturing process as well as their ability to engineer and build a well thought-out structure with visual appeal was the solution.

Through a cooperative team effort, we worked together to design a structure that would be flexible, functional and efficient. Their design would work in both new markets and existing market rebuilds. While Whitley Manufacturing constructed 85% of the building, the customer was preparing the site and foundation. To further help save time, most of the mechanical, electrical and plumbing fixtures were pre-installed at the Whitley plant. Approximately 10 weeks later, the modules were delivered. This left setting and finishing-out the modules and installing the equipment. In a matter of a couple more weeks, were preparing the store and employees for its Grand Opening.

A fast-track, brand-driven modular restaurant prototype designed to accelerate franchise expansion. Built with precision and efficiency, this innovative solution delivers operational-ready stores in a fraction of traditional construction time while maintaining strong visual brand identity

key achievements

  • 85% of construction completed offsite.
  • Store completed in approximately 10 weeks.
  • Reduced on-site labor hours and material waste.
  • No disruption to surrounding retail operations.
  • Accelerated time to revenue and grand opening.

Building Floor Plan Highlights

  • Customer entry with branded storefront and large glass façade.
  • Dedicated order counter and POS stations.
  • Open kitchen layout with clear workflow zones.

case study summary

Requiring a rapid way to grow their franchise development program, Modular construction became the answer. The goal: implement their new Pizza Theater design for its emerging restaurants and have them operational faster than a conventional build. Whitley’s accelerated manufacturing process as well as their ability to engineer and build a well thought-out structure with visual appeal was the solution.

Through a cooperative team effort, we worked together to design a structure that would be flexible, functional and efficient. Their design would work in both new markets and existing market rebuilds. While Whitley Manufacturing constructed 85% of the building, the customer was preparing the site and foundation. To further help save time, most of the mechanical, electrical and plumbing fixtures were pre-installed at the Whitley plant. Approximately 10 weeks later, the modules were delivered. This left setting and finishing-out the modules and installing the equipment. In a matter of a couple more weeks, were preparing the store and employees for its Grand Opening.

A fast-track, brand-driven modular restaurant prototype designed to accelerate franchise expansion. Built with precision and efficiency, this innovative solution delivers operational-ready stores in a fraction of traditional construction time while maintaining strong visual brand identity