project summary

Corrections

location

Confidential

Sunbelt facility

ProMod Manufacturing
A Sunbelt Company

size

5,775 sq. ft.

key achievements

  • Integrated with 1957 non-modular foundation — a major engineering achievement.

  • Flexible floor plan with open office, conference, and private workspaces.

  • Durable modular solution designed to meet federal operational needs.

  • Efficient delivery while overcoming legacy foundation challenges.

Building Floor Plan Highlights

  • Large open office for collaborative work.

  • Four private offices for administrative and supervisory staff.

  • Conference room for meetings and instruction.

  • Break room & IT room for staff support.

  • Restroom facilities for staff and trainees.

case study summary

The Federal Law Enforcement Training Center required a modern training facility that could integrate with an existing 1957-built non-modular foundation. The challenge was to design and deliver a building that met the operational needs of federal training while adapting to legacy infrastructure

Sunbelt’s ProMod Manufacturing delivered a 5,775 sq. ft. multi-office modular training facility, combining open office space, conference areas, and private offices. The building also includes break areas, restrooms, and IT support rooms, creating a full-service training hub for federal agents.

The success of this project highlights modular construction’s ability to adapt to unconventional foundation conditions, while still providing a cost-effective, timely, and durable solution for government clients.

key achievements

  • Integrated with 1957 non-modular foundation — a major engineering achievement.

  • Flexible floor plan with open office, conference, and private workspaces.

  • Durable modular solution designed to meet federal operational needs.

  • Efficient delivery while overcoming legacy foundation challenges.

Building Floor Plan Highlights

  • Large open office for collaborative work.

  • Four private offices for administrative and supervisory staff.

  • Conference room for meetings and instruction.

  • Break room & IT room for staff support.

  • Restroom facilities for staff and trainees.

case study summary

The Federal Law Enforcement Training Center required a modern training facility that could integrate with an existing 1957-built non-modular foundation. The challenge was to design and deliver a building that met the operational needs of federal training while adapting to legacy infrastructure

Sunbelt’s ProMod Manufacturing delivered a 5,775 sq. ft. multi-office modular training facility, combining open office space, conference areas, and private offices. The building also includes break areas, restrooms, and IT support rooms, creating a full-service training hub for federal agents.

The success of this project highlights modular construction’s ability to adapt to unconventional foundation conditions, while still providing a cost-effective, timely, and durable solution for government clients.