project summary

Miscellaneous

category
location

Coastal U.S.A.

Sunbelt facility

Southeast Modular
A Sunbelt Company

size

9,000 sq. ft.

key achievements

  • 1,800 sq. ft. two-story space with soaring 19-foot ceilings — a rare achievement in modular construction.

  • LEED Silver standard achieved with solar canopy, EV charging, and smart tech.

  • Sustainable materials chosen to improve indoor air quality and human health.

  • Passenger-first layout balancing security, comfort, and flow efficiency.

Building Floor Plan Highlights

  • Ticketing & Security Check for streamlined passenger flow.

  • Select & Standard Lounges with vending and comfort areas.

  • Two-story lobby with 19’ ceilings for a spacious arrival experience.

  • Baggage Security area for safety and compliance.

  • Break Room & Offices for staff support and operations.

  • Smart, eco-friendly systems with EV charging and water reduction technology.

case study summary

Brightline’s mission is to create fast, eco-friendly train routes between Florida’s major cities. To achieve this, they needed a new station in Aventura that would connect passengers quickly and comfortably to Miami and beyond.

Southeast Modular partnered with Alternative Building Solutions to deliver a 12-module, 9,000 sq. ft. train station along West Dixie Highway. The design includes an 1,800 sq. ft. two-story space with soaring 19-foot ceilings — a rare achievement in modular construction.

Built to LEED Silver standards, the facility supports Brightline’s sustainability goals through a solar canopy, EV charging stations, water-saving smart technology, and carefully selected materials that improve indoor air quality. The result is a modern, efficient transportation hub that blends speed, design innovation, and environmental responsibility

key achievements

  • 1,800 sq. ft. two-story space with soaring 19-foot ceilings — a rare achievement in modular construction.

  • LEED Silver standard achieved with solar canopy, EV charging, and smart tech.

  • Sustainable materials chosen to improve indoor air quality and human health.

  • Passenger-first layout balancing security, comfort, and flow efficiency.

Building Floor Plan Highlights

  • Ticketing & Security Check for streamlined passenger flow.

  • Select & Standard Lounges with vending and comfort areas.

  • Two-story lobby with 19’ ceilings for a spacious arrival experience.

  • Baggage Security area for safety and compliance.

  • Break Room & Offices for staff support and operations.

  • Smart, eco-friendly systems with EV charging and water reduction technology.

case study summary

Brightline’s mission is to create fast, eco-friendly train routes between Florida’s major cities. To achieve this, they needed a new station in Aventura that would connect passengers quickly and comfortably to Miami and beyond.

Southeast Modular partnered with Alternative Building Solutions to deliver a 12-module, 9,000 sq. ft. train station along West Dixie Highway. The design includes an 1,800 sq. ft. two-story space with soaring 19-foot ceilings — a rare achievement in modular construction.

Built to LEED Silver standards, the facility supports Brightline’s sustainability goals through a solar canopy, EV charging stations, water-saving smart technology, and carefully selected materials that improve indoor air quality. The result is a modern, efficient transportation hub that blends speed, design innovation, and environmental responsibility

resources

Case Study PDF