project summary
Modular Healthcare Facility
category
location
Midwestern U.S.A.
Sunbelt facility
Whitley Manufacturing A Sunbelt Company
size
12,648 sq. ft.
Key Achievements
Building Floor Plan Highlights

case study summary
A temporary, turnkey, fully shielded radiation treatment solution designed to dramatically reduce the time required to bring advanced oncology services online. Engineered for speed and precision, the system can be delivered, installed, and ready for patient treatment in as little as two weeks at your site. Each system can be assembled on location with a pre-installed Varian linear accelerator, arriving fully integrated and complete with acceptance testing, calibration, and comprehensive data collection already performed. This streamlined approach minimizes on-site commissioning time and ensures clinical readiness upon installation.
Partnering with Whitley Manufacturing for the modular building construction further accelerated the project timeline. By fabricating the structure off-site while site preparation occurred concurrently, the hospital’s new Radiation Treatment Center was installed and fully operational in a fraction of the time typically required for conventional construction. This accelerated delivery allowed the hospital to begin treating patients sooner, reduce downtime between equipment upgrades, and achieve a faster return on its capital investment.
Key Achievements
Building Floor Plan Highlights

case study summary
A temporary, turnkey, fully shielded radiation treatment solution designed to dramatically reduce the time required to bring advanced oncology services online. Engineered for speed and precision, the system can be delivered, installed, and ready for patient treatment in as little as two weeks at your site. Each system can be assembled on location with a pre-installed Varian linear accelerator, arriving fully integrated and complete with acceptance testing, calibration, and comprehensive data collection already performed. This streamlined approach minimizes on-site commissioning time and ensures clinical readiness upon installation.
Partnering with Whitley Manufacturing for the modular building construction further accelerated the project timeline. By fabricating the structure off-site while site preparation occurred concurrently, the hospital’s new Radiation Treatment Center was installed and fully operational in a fraction of the time typically required for conventional construction. This accelerated delivery allowed the hospital to begin treating patients sooner, reduce downtime between equipment upgrades, and achieve a faster return on its capital investment.





