project summary
Modular Bathroom
category
location
Midwestern U.S.A.
Sunbelt facility
Whitley Manufacturing A Sunbelt Company
size
144 sq. ft.
key achievements
Building Floor Plan Highlights

case study summary
Crafting a resilient single-unit restroom, strategically designed with a natural stone exterior to harmonize with the peaceful park surroundings; presented a unique blend of aesthetic and functional considerations. Navigating the intricacies of this endeavor, the modular restroom was outfitted with a remote alarm system, ensuring swift notifications to park personnel when maintenance was required. Whitley’s unwavering commitment to excellence became apparent in the intricate integration of plumbing, electrical systems, and ADA-compliant features. This comprehensive approach not only upheld the company’s reputation but also streamlined the construction and installation processes to achieve peak efficiency.
Notably, the distinctive nature of this project necessitated overcoming the logistical hurdles associated with entirely offsite prefabrication of the modular restroom unit. This challenge further underscored Whitley’s adaptability and expertise in modular construction.
In summation, this endeavor demonstrated Whitley’s ability to overcome project-specific challenges while adhering to its dedication to quality and innovation.
key achievements
Building Floor Plan Highlights

case study summary
Crafting a resilient single-unit restroom, strategically designed with a natural stone exterior to harmonize with the peaceful park surroundings; presented a unique blend of aesthetic and functional considerations. Navigating the intricacies of this endeavor, the modular restroom was outfitted with a remote alarm system, ensuring swift notifications to park personnel when maintenance was required. Whitley’s unwavering commitment to excellence became apparent in the intricate integration of plumbing, electrical systems, and ADA-compliant features. This comprehensive approach not only upheld the company’s reputation but also streamlined the construction and installation processes to achieve peak efficiency.
Notably, the distinctive nature of this project necessitated overcoming the logistical hurdles associated with entirely offsite prefabrication of the modular restroom unit. This challenge further underscored Whitley’s adaptability and expertise in modular construction.
In summation, this endeavor demonstrated Whitley’s ability to overcome project-specific challenges while adhering to its dedication to quality and innovation.









