  • Maintained full stadium functionality during a $95M renovation.
  • Delivered complete solution within an accelerated nine-month timeline.
  • Provided interim press and suite space without interrupting scheduled events.
  • Engineered to withstand extreme seismic and wind loads.
  • Designed for post-renovation reuse as four individual two-story press boxes.

Building Floor Plan Highlights

  • Relocatable two-story modular press box configuration.
  • Eight private luxury suites positioned along the front façade.
  • Integrated camera deck with reinforced roof structure.

case study summary

With Whitley’s extensive knowledge in modular construction, a prestigious university approached the company with the need for a temporary press box building while stadium renovations were underway.

The 95-year-old stadium complex was undergoing an extensive two-year renovation designed to improve the fan experience and construct a completely new press box along with luxury suites. During this period, however, the stadium still needed to host a rigorous schedule of events and remain fully operational.

Renovation work began immediately after the final football game in 2017. However, the permanent press boxes would not be completed until the 2019–2020 season. As a result, the university required a fully functional, stylish, and rapidly delivered temporary press box solution for the 2018–2019 season.

key achievements

  • Maintained full stadium functionality during a $95M renovation.
  • Delivered complete solution within an accelerated nine-month timeline.
  • Provided interim press and suite space without interrupting scheduled events.
  • Engineered to withstand extreme seismic and wind loads.
  • Designed for post-renovation reuse as four individual two-story press boxes.

Building Floor Plan Highlights

  • Relocatable two-story modular press box configuration.
  • Eight private luxury suites positioned along the front façade.
  • Integrated camera deck with reinforced roof structure.

case study summary

With Whitley’s extensive knowledge in modular construction, a prestigious university approached the company with the need for a temporary press box building while stadium renovations were underway.

The 95-year-old stadium complex was undergoing an extensive two-year renovation designed to improve the fan experience and construct a completely new press box along with luxury suites. During this period, however, the stadium still needed to host a rigorous schedule of events and remain fully operational.

Renovation work began immediately after the final football game in 2017. However, the permanent press boxes would not be completed until the 2019–2020 season. As a result, the university required a fully functional, stylish, and rapidly delivered temporary press box solution for the 2018–2019 season.