project summary

Modular Press Box

category
location

Midwestern U.S.A.

Sunbelt facility

Whitley Manufacturing
A Sunbelt Company

size

800 sq. ft.

key achievements

  • Delivered 25% faster than traditional construction methods.
  • Expanded interior width increased functionality and long-term value.
  • Improved broadcast and filming capabilities for multiple sports.
  • Provided weather-protected platforms for year-round use.
  • Modernized outdated athletic facilities with minimal disruption.

Building Floor Plan Highlights

  • Custom 12’-0” wide press box (expanded from standard 8’-0” width).
  • Open interior layout designed for full media crew operations.
  • Dedicated private coach areas for home and opposing teams.

case study summary

This Catholic High School has the mission of providing a safe, nurturing, creative, and challenging campus where individuals grow in knowledge and faith. The High School needed to upgrade their aging athletic venue and facilities. This included new seating, steps, ramps, and a large custom press box to accommodate the local media, home and opposing coaching staffs, and provide filming platforms shielded from the elements.

To meet these needs, a custom 12-foot-wide modular press box was designed and installed overlooking the stadium seating. The structure provides a modern, enclosed space for media coverage, coaching coordination, and game-day operations while integrating covered filming platforms for year-round use. The expanded interior layout allows multiple media personnel and staff to work efficiently during events, while the elevated placement offers clear sightlines across the field. By using modular construction, the school was able to upgrade its athletic facilities quickly and with minimal disruption to ongoing campus activities.

key achievements

  • Delivered 25% faster than traditional construction methods.
  • Expanded interior width increased functionality and long-term value.
  • Improved broadcast and filming capabilities for multiple sports.
  • Provided weather-protected platforms for year-round use.
  • Modernized outdated athletic facilities with minimal disruption.

Building Floor Plan Highlights

  • Custom 12’-0” wide press box (expanded from standard 8’-0” width).
  • Open interior layout designed for full media crew operations.
  • Dedicated private coach areas for home and opposing teams.

case study summary

This Catholic High School has the mission of providing a safe, nurturing, creative, and challenging campus where individuals grow in knowledge and faith. The High School needed to upgrade their aging athletic venue and facilities. This included new seating, steps, ramps, and a large custom press box to accommodate the local media, home and opposing coaching staffs, and provide filming platforms shielded from the elements.

To meet these needs, a custom 12-foot-wide modular press box was designed and installed overlooking the stadium seating. The structure provides a modern, enclosed space for media coverage, coaching coordination, and game-day operations while integrating covered filming platforms for year-round use. The expanded interior layout allows multiple media personnel and staff to work efficiently during events, while the elevated placement offers clear sightlines across the field. By using modular construction, the school was able to upgrade its athletic facilities quickly and with minimal disruption to ongoing campus activities.