project summary

Modular Press Box

category
location

Midwestern U.S.A.

Sunbelt facility

Whitley Manufacturing
A Sunbelt Company

size

240 sq. ft.

key achievements

  • 100% completed off-site prior to delivery.
  • Single-module design simplifying transport and placement.
  • Rapid on-site installation for quick operational readiness.
  • Pre-installed electrical and interior furnishings.
  • Delivered within a tight athletic season timeline.
  • Minimal disruption to campus during installation.

Building Floor Plan Highlights

  • Single 240 sq. ft. modular unit.
  • Private interior office space.
  • Elevated lookout viewing area.
  • Dedicated media desks for announcers and scorekeepers.
  • Durable metal exterior finish.

case study summary

Whitley partnered with a company to design and construct a modular press box for Prep School. The single-module structure was thoughtfully designed to support game-day operations, featuring a private interior office, elevated lookout stand, and dedicated media desks to accommodate announcers, scorekeepers, and media personnel. The building was completed to 100% inside Whitley’s manufacturing facility, with all electrical systems, lighting, finishes, and furnishings fully installed prior to delivery, allowing for a streamlined and efficient on-site installation.

Constructing the press box required careful coordination to meet a tight project timeline and ensure readiness for upcoming sporting events. By maximizing the amount of work completed within the controlled factory environment – including electrical wiring, technology rough-ins, and interior build-out. Whitley minimized on-site labor and significantly reduced installation time. The modular approach not only ensured quality control and schedule certainty but also delivered a durable, functional structure that enhances the game-day experience for athletes, staff, students, and spectators alike.

A fully prefabricated modular press box designed for rapid installation and immediate game-day readiness. Built to enhance athletic event operations, this single-module structure delivers functionality, durability, and speed to meet demanding school schedules.

key achievements

  • 100% completed off-site prior to delivery.
  • Single-module design simplifying transport and placement.
  • Rapid on-site installation for quick operational readiness.
  • Pre-installed electrical and interior furnishings.
  • Delivered within a tight athletic season timeline.
  • Minimal disruption to campus during installation.

Building Floor Plan Highlights

  • Single 240 sq. ft. modular unit.
  • Private interior office space.
  • Elevated lookout viewing area.
  • Dedicated media desks for announcers and scorekeepers.
  • Durable metal exterior finish.

case study summary

Whitley partnered with a company to design and construct a modular press box for Prep School. The single-module structure was thoughtfully designed to support game-day operations, featuring a private interior office, elevated lookout stand, and dedicated media desks to accommodate announcers, scorekeepers, and media personnel. The building was completed to 100% inside Whitley’s manufacturing facility, with all electrical systems, lighting, finishes, and furnishings fully installed prior to delivery, allowing for a streamlined and efficient on-site installation.

Constructing the press box required careful coordination to meet a tight project timeline and ensure readiness for upcoming sporting events. By maximizing the amount of work completed within the controlled factory environment – including electrical wiring, technology rough-ins, and interior build-out. Whitley minimized on-site labor and significantly reduced installation time. The modular approach not only ensured quality control and schedule certainty but also delivered a durable, functional structure that enhances the game-day experience for athletes, staff, students, and spectators alike.

A fully prefabricated modular press box designed for rapid installation and immediate game-day readiness. Built to enhance athletic event operations, this single-module structure delivers functionality, durability, and speed to meet demanding school schedules.

resources

Case Study PDF