project summary

Modular Bathroom

location

Coastal U.S.A.

Sunbelt facility

Whitley Manufacturing
A Sunbelt Company

size

336 sq. ft.

key achievements

  • 100% off-site fabrication minimizing on-site construction time.
  • Engineered to withstand coastal area’s varying climate conditions.
  • Successfully integrated remote alarm monitoring system.
  • Seamless coordination of plumbing, electrical, and ADA features.
  • Streamlined installation process reducing overall project timeline.

Building Floor Plan Highlights

  • Separate men’s and women’s restroom areas.
  • ADA-compliant accessible restroom facilities.
  • Durable vault system designed for park environments.
  • Secure maintenance access points.

case study summary

The goal was to create a modular restroom building capable of withstanding the demanding climates of this coast area. One of the significant challenges was to incorporate a remote alarm system within the structure, facilitating timely notifications for park personnel concerning essential vault maintenance. Furthermore, Whitley navigated the intricate task of harmoniously integrating plumbing, electrical systems, and ADA-compliant features into the design. This comprehensive approach not only upheld Whitley’s reputation for excellence but also streamlined the construction timeline and installation process, optimizing overall efficiency.

A standout feature of this endeavor was the complete offsite fabrication of the modular restroom. While this approach introduced logistical complexities, it highlighted Whitley’s capacity to overcome the unique challenges associated with remote construction.In summary, this project showcased Whitley’s ability to address project-specific hurdles while upholding their commitment to innovation and top-notch quality.

Drawing on Whitley’s extensive 75+ years of experience in modular construction, the company successfully crafted a modular restroom building designed to endure the challenging climates of the coastal area.

A fully prefabricated modular restroom facility engineered for durability, accessibility, and operational efficiency. Designed to withstand the coastal area’s demanding climate conditions, this solution delivers reliable public infrastructure with streamlined installation and advanced monitoring capabilities.

key achievements

  • 100% off-site fabrication minimizing on-site construction time.
  • Engineered to withstand coastal area’s varying climate conditions.
  • Successfully integrated remote alarm monitoring system.
  • Seamless coordination of plumbing, electrical, and ADA features.
  • Streamlined installation process reducing overall project timeline.

Building Floor Plan Highlights

  • Separate men’s and women’s restroom areas.
  • ADA-compliant accessible restroom facilities.
  • Durable vault system designed for park environments.
  • Secure maintenance access points.

case study summary

The goal was to create a modular restroom building capable of withstanding the demanding climates of this coast area. One of the significant challenges was to incorporate a remote alarm system within the structure, facilitating timely notifications for park personnel concerning essential vault maintenance. Furthermore, Whitley navigated the intricate task of harmoniously integrating plumbing, electrical systems, and ADA-compliant features into the design. This comprehensive approach not only upheld Whitley’s reputation for excellence but also streamlined the construction timeline and installation process, optimizing overall efficiency.

A standout feature of this endeavor was the complete offsite fabrication of the modular restroom. While this approach introduced logistical complexities, it highlighted Whitley’s capacity to overcome the unique challenges associated with remote construction.In summary, this project showcased Whitley’s ability to address project-specific hurdles while upholding their commitment to innovation and top-notch quality.

Drawing on Whitley’s extensive 75+ years of experience in modular construction, the company successfully crafted a modular restroom building designed to endure the challenging climates of the coastal area.

A fully prefabricated modular restroom facility engineered for durability, accessibility, and operational efficiency. Designed to withstand the coastal area’s demanding climate conditions, this solution delivers reliable public infrastructure with streamlined installation and advanced monitoring capabilities.

resources

Case Study PDF