project summary

Modular Classroom Facility

category
location

Northeastern U.S.A.

Sunbelt facility

Whitley Manufacturing
A Sunbelt Company

size

3,600 sq. ft.

key achievements

  • Rapid deployment to meet urgent COVID-era expansion needs.
  • Manufactured off-site for minimal campus disruption.
  • Delivered and installed without interrupting ongoing classes.
  • Designed to mirror permanent classroom functionality.
  • High-quality modular system ensuring long-term durability.

Building Floor Plan Highlights

  • Two fully equipped classrooms with traditional layouts.
  • Large windows providing abundant natural light.
  • Integrated HVAC and acoustic systems for comfort and focus.
  • ADA-accessible entry and circulation.

case study summary

In a time of urgent need and uncertainty from the COVID-19 pandemic Whitley and a Sunbelt Dealer worked together to create a temporary space with incredible design, and interior features.

The Academy is a prestigious preparatory school. With the COVID-19 pandemic the Academy needed to rapidly expand their classroom space on campus to accommodate for social distancing without taking away from their world class in-person instruction to their students.

Function was also a critical aspect of the project to make sure the learning environment of the classroom was not negatively impacted so the interior of the temporary space needed to accommodate the features that were in place within the schools permanent facilities.

Whitley was able to manufacture, four modules that combined to create two separate classrooms with all the amenities found in a traditional classroom on campus to ensure an optimal learning environment.