  • Delivered 100% complete with electrical and furnishings pre-installed.
  • Reduced on-site construction time through modular fabrication.
  • Enhanced organization and separation for media and game-day personnel.
  • Seamlessly integrated into existing athletic facilities.
  • Improved game-day operations and broadcast capabilities.

Building Floor Plan Highlights

  • 30’-0” long x 8’-0” wide modular footprint.
  • Two dedicated interior rooms separating media and game-day staff operations.
  • Open viewing area with expansive front-facing windows.

case study summary

Whitley proudly crafted a state-of-the-art press box for a high school, utilizing their innovative modular construction methods. This cutting-edge facility stands as a testament to Whitley’s commitment to quality and efficiency in educational infrastructure. The press box, seamlessly integrated into the school’s athletic facilities, showcases Whitley’s expertise in designing and constructing modular buildings that meet the unique needs of educational institutions.

Measuring 30 feet in length and 8 feet in width, this meticulously designed structure offers a streamlined solution for the high school’s athletic facilities. Noteworthy for its spatial efficiency, the press box features two separate rooms dedicated to media and game day staff, providing distinct spaces for optimal functionality and organization during events.

The inclusion of aluminum stairs leading up to the press box adds a touch of modernity and durability to the structure, ensuring safe and convenient access for personnel.

A state-of-the-art modular press box engineered to enhance high school athletic broadcasting capabilities, streamline on-site installation, and deliver a durable, media-ready environment tailored to the evolving needs of educational sports programs.

key achievements

  • Delivered 100% complete with electrical and furnishings pre-installed.
  • Reduced on-site construction time through modular fabrication.
  • Enhanced organization and separation for media and game-day personnel.
  • Seamlessly integrated into existing athletic facilities.
  • Improved game-day operations and broadcast capabilities.

Building Floor Plan Highlights

  • 30’-0” long x 8’-0” wide modular footprint.
  • Two dedicated interior rooms separating media and game-day staff operations.
  • Open viewing area with expansive front-facing windows.

case study summary

Whitley proudly crafted a state-of-the-art press box for a high school, utilizing their innovative modular construction methods. This cutting-edge facility stands as a testament to Whitley’s commitment to quality and efficiency in educational infrastructure. The press box, seamlessly integrated into the school’s athletic facilities, showcases Whitley’s expertise in designing and constructing modular buildings that meet the unique needs of educational institutions.

Measuring 30 feet in length and 8 feet in width, this meticulously designed structure offers a streamlined solution for the high school’s athletic facilities. Noteworthy for its spatial efficiency, the press box features two separate rooms dedicated to media and game day staff, providing distinct spaces for optimal functionality and organization during events.

The inclusion of aluminum stairs leading up to the press box adds a touch of modernity and durability to the structure, ensuring safe and convenient access for personnel.